EverFocus Paragon264 1TB Manuel d'instructions Page 27

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 134
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 26
20
Figure 2-2 Network Connection through Patch Cable
Pinout of straight patchcable
2.8 FINAL INSTALL PROCESS
Once you have completed the basic wiring connections, you are ready to turn on the DVR. Simply plug in
the power source. The POWER LED will light up if power is normal. Once the system has finished loading,
you can begin to set up the menu options for the DVR.
Vue de la page 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 133 134

Commentaires sur ces manuels

Pas de commentaire